Well Ive started to call it a house, not a site........ the place has changed so much in the space of 9 days! last time i updated you i had finished Insulating the ground floor ready for the underfloor heating guys to come in. last Monday they came in and installed all the pipe work for the system on the ground floor.


The manifolds will terminate neatly under the stairs, when there are in fact stairs!


The sea of pipes was quite a sight to behold! we have left gaps for some of the architectural fixings like the kitchen island the stairs, toilets. At this point i thought it would be prudent to photograph exactly where all the pipes are so that i cannot have the excuse in the future that i didn't know, when drilling or moving things. This proved one of the most useful exercises when i came to install the stud walls on the ground floor this weekend.


I realised last week that i hadn't introduced the team of builders from Abode, our building contractors. Left to right we have Speedy Tom, French Kenny and Clever Luke. these guys are on site all of the time at the moment with cameos from their colleagues and other trades, they are very tolerant of my inexperience and are very helpful and supportive of my weekend efforts!

Tuesday last week saw the screed team come on site and screed the ground floor, this made a huge difference, it set the ground floor at its proper height and really finished it off from an aesthetic level:-


The finish looks great, it is a fast curing compound which meant that it takes 2 days to dry enough for foot traffic and is fully cured and ready to take a floor finish in 7 days! we didn't need this speed but the curing times of a normal 65mm screed could be up to 2/3 months based on the atmosphere, so for the small extra cost we opted for the fast drying option.

So last weekend, it was my first attempt at stud partition walls! using Speed line galvanised steel studs, i aimed to get the ground floor studded last weekend and i made it!



We are using double skinned walls, which will be plaster boarded on either side, there will be mineral wool through the middle and this will drastically reduce sound transfer between rooms. It will also create stronger thermal properties as there will be two independent unconnected walls.


This section was the most complicated, here we have what will be the office and on the right a cloakroom and media hub.

its been a busy week on site too! the guys have brought the block work up to form the second floor and by the end of the week most of the blocks will be up to head height of the windows, allowing me to board the second floor on the weekend..


The summit of the tent is being reached and the trusses are on order! talking of the tent, i have made some big underestimates with the tent calculator. Last post showed 45 days tented and 14 saved. the actual number of days tented was 50 and according to the site diary, which the builders keep the actual number of days was 29, due to a mixture of temperature and conditions. this last 2 weeks, the tent has been justified, we wouldn't have got anything done in the last 2 weeks due to the rain so i take great pleasure in correcting and updating the tent calculator as follows:-

No of working days tented (this includes weekends I'm down there too) - 59

No of days saved to weather - 38

No of days done ahead of untended schedule - 7

Chipboad floor onto the top floor this weekend! ill let you know how we get on!

Neil

6 comments:

  1. About time I have been waiting for an update :)
    Good work - you should be very proud!!
    Chris

    ReplyDelete
  2. Hey! You have such an interesting and informative page. I will be looking forward to visit your page again and for your other posts as well. Thank you for sharing your thoughts about electricians. I am glad to stop by your site and know more about electricians. Keep it up! This is a good read.
    Electrical licensing in Australia is regulated by the individual states. In Western Australia the Department of Commerce tracks licensee's and allows the public to search for individually named/licensed Electricians.
    McCurdy Electrical Service is a Burlington, MA electrician who delivers superior performance on any project we take on. We are a team of dedicated, experienced electricians managed by highly trained professionals.

    Electrician Burlington MA

    ReplyDelete
    Replies
    1. Individuals who are interested in an Industrial Electrician Apprentice program must contact industries on their own. Each company has their own requirements for entry into the apprenticeship program.

      Commercial Electrician

      Delete
  3. Nice thought I like you thought I also tell you Don't be tempted by One-Coat plasters or any other type or brand of finishing plaster. Nearly all professionals use Multi-Finish by Thistle as it's the best plaster for the job. Multi-FInish plaster is identifiable by it's bright orange label and is available in all major DIY chains.Plastering London Plasterers Rendering

    ReplyDelete
  4. Oak Framed Extensions really are very eco-friendly, despite what some people might think. The first thing that enters everyone’s minds when they hear ‘timber frame’ is deforestation, but the reality is that, while it is an issue, it isn’t a consequence of UK construction.

    ReplyDelete
  5. Nice blog


    Prop World Realty (09810000375) presents a real estate services to our clients in the different segments of residential, commercial property with affordable price. For more details visit at: http://www.resalepropertyinnoida.in/

    ReplyDelete

I would love to hear your comments!